FORGAS Arquitectes

Projectes on hem col·laborat

Team members with FORGAS Arquitectes, Elena Valls and Pep Buxadé, CEDIPSA and Josep Lascurain in the planting and irrigation system of over 1 km of...
Definition of the planting and irrigation network for the public park situated under Torre Baró.
Gardening of the roof of the halfway station of the cable railway of Montjuïc and restoring of the slope by the means of erosion control...
Ornamental planting and irrigation network of the urban park adjacent to the train line.
Design of the plantings and irrigation at Montjuïc of the section between the castle and the belvedere 'Mirador de l'Alcalde'.
Restoration of planting and irrigation network, in coincidence with the construction of the walking route and restoration of the artistic paving.
Planting and fertirrigation design of the green façade with climbers coverage of the energy producing center, Barcelona
Analysis of the existing trees and their potential use for the new pedestrianized avenue in Parets del Vallès (Barcelona). Definition of the tree protection and...
Fotomuntatge FORGAS Arquitectes